Friday 6 April 2012

Wind Mast::PVK WIND MAST:PVK & PRK Engineers:Wind Resource Analysis



WELCOME TO PVK & PRK ENGINEERS WIND MAST SERVICES

   P-V-K Engineers, a multi technology and innovative Engineering outfit was established in the year 1983 by Two Technocrats with a shared vision committed to deliver reliable Engineering Products & Services.
P-V-K's consistent growth over the last 25 years has been symbolized by diligent and committed contributions toward the Power, Cement, Petrochemical and Process & Allied Industries.
A new entity, by name PVK & PRK ENGINEERS, is registered to take care of wider area of engineering including the present activities of existing P-V-K Engineers (P) Limited also.
The group has also established a well entrenched infrastructural base by participating in the formation of associate companies which serve to compliment its principal facilities, thereby rendering a key advantage in controlling project logistics and costs.
P-V-K Engineers is dedicated to world class Engineering Products (Design & Manufacturing). P-V-K is known for incorporating the high engineering standards in all products. This attentiveness to all particulars of each design phase enables the company to ensure enduring value to our customers.

Lattice Wind Mast:


PVR & PRK Engineers., is leading designer, manufacturer and supplier of wind resource monitoring masts.

Innovative Designs

PVK 65mtr & 80mtr High Lattice type Masts to withstand the worst environment conditions, designed specifically for wind resource measurements, is ice-rated for extreme climates, and exceeds EIA-222-F Standards.
These masts redefining wind monitoring Technology combining Ground breaking engineering and design whilst proving easy to assemble and install on even critical site.
Once assembled and installed, enables accurate wind resource monitoring at the defined height with minimal visual impact.
These masts are specifically designed for remote monitoring and have been extensively designed for high wind conditions .
Modular designed components make it possible to transport these sections, with the help of small carts or small vehicles. These masts designed to erect in isolated, difficult and uneven ground. The mast sections are in 5.5m maximum length allow for quick transportation, assemble, erect, de-erect and disassemble on site

Features

Once the Mast is assembled there is no need for any specialized equipments for working at heights. In case of need the instruments could be attended by climbing up.
All the required instruments you needed can be fitted and attended, replaced even after erecting the mast upwards.
The each mast section will be independently lifted up one after other by fastening at each level with supplied screws, nuts & washers. One lifting tackle, a rope & a lifting pulley are the few equipments required to erect the mast.
Fast installation times prove a great advantage in adverse conditions.


Contact Us

Regd. Office:
M.C.H. # 985, Road # 10, Jubilee Hills, Hyderabad , 500 033, India
Tel: +91-40-2354 4558,2354 2019, Fax: +91-40-2354 4558

Works

Plot No.23, Phase-IV, I.D.A. Jeedimetla, Hyderabad รข€“ 500 055, India
Tel: +91-40-2309 5436, Fax: +91-40- 2309 6561

E-Mail

support@pvkwindmast.com, info@pvkcommunications.com
www.
pvknprk.com
www.
pvkwindmast.com
www.
pvkcommunications.com


No comments:

Post a Comment